Trading costs explained

Small costs.
Different outcomes.

Spread, commissions and execution differences can change both the allowed size and the net result. State what your model has already counted.

Guided example · Synthetic cost arithmetic · midpoint and bid/ask alternatives

Count each cost once

Start with a midpoint-based model and build the same complete risk estimate as the guide.

Restart & example assumptions

Authored synthetic observations, shown in sequence. Every comparison uses only the revealed data. This is a worked learning example, not live prices, broker execution or a profitability backtest. Follow the article’s exact definitions; measurements and pattern names alone do not authorize a trade.

For charts: tap a candle or swing to inspect it; drag horizontally to browse; wheel or +/− to zoom; arrow keys to inspect; Home to restore the step view.

Start with the price source

A midpoint or last-trade simulation does not automatically include buying at an ask and selling at a bid. If your fill model already uses the executable sides, do not add the same spread a second time. Keep commissions and adverse slippage separate from that decision.

A complete arithmetic example

This synthetic midpoint-based example uses a 1-point gross entry-to-stop distance, $1 cash value per point per unit, a 0.10-point round-trip spread allowance, $0.02 round-trip fees per unit and 0.05 points of additional adverse execution allowance.

Estimated risk per unit = (1 + 0.10 + 0.05) × $1 + $0.02 = $1.17

100 units would imply $117 estimated loss at the stop.

For a $100 total budget: floor(100 / 1.17) = 85 units; estimated loss = $99.45.

The budget is an estimate, not a guaranteed maximum. Actual gaps and fills can be worse.

What to ask before comparing a fee schedule

Do not reduce the analysis to “zero commission”

A low visible commission does not establish a low total cost. Equally, a higher headline fee does not alone establish worse execution. Compare documented terms and actual execution records for the same instrument and use case.

A useful review habit

Record gross price result, explicit charges and execution differences separately. Express net result against the original risk denominator. Do not retrospectively shrink the denominator after taking a loss.

Educational cost model, not a broker quote or recommendation. Verify current product terms and contract specifications.